Home
Page
Community
Management
Clubs
Art Club
Computer Club
Men's Club
Men's Golf Club
Social Club
Tennis Club
Women's Club
Yiddish Club
Banyan
Banner
Associations
Personals
Cop
Banyan
Springs
Rules &
Regulations
Guide
to Banyan Springs
Reports
and
Meeting Minutes


Mgt.Update
12-17-08
Gen
Mtg 11-19-08
Mgt.Update
12-04-08
Wkshp
Mtg 11-06-08
Mgt.Update
11-06-08
Wkshp
Mtg10-30-08
Mgt
Update 10-30-08
Wkshp
Mtg 10-08-08
Mgt.
Update 10-15-08
Wkshp
Mtg 09-18-08
Mgt
Update 09-18-08
Wkshp
Mtg 08-21-08
Mgt.Update
08-21-08
Wkshp
Mtg 07-24-08
Mgt.
Update 07-24-08


Feedback
| |
MANAGEMENT
UPDATE
THURSDAY,
AUGUST 9, 2007
= = = = = = = = = = = = = = = = = = = =
Gold Coast Surfaces completed the Pool Deck Resurfacing Project on Wednesday,
August 1st and the pool opened on Saturday the 4th.
Although the project took a little longer than expected, the new surface
is cooler on the feet, non-slip and so much more attractive than the original
deck.
S.P.M. is progressing with the Wood Deck Replacement Project.
New stringers and rail support beams have been installed on the bridge
and the concrete pilings and stringers have been installed to support the deck.
S.P.M. will be installing the Timbertech deck boards and railings on the
bridge then begin installing them on the sun deck.
When this project is complete, the entire pool area will be a showplace
for the community, increase the value of the common elements as well as more
cost effective to maintain.
Some of the preliminary work on the Natural Gas Conversion Project has been
completed by Boucher’s Gas Company in preparation for the conversion from
propane to natural gas. New gas
lines have been installed for the generator, pool heaters and other appliances
that will be converted to natural gas. Other
modifications will be done around the time when the supply lines have been
installed and the actual conversion will take place. Meanwhile, we have received confirmation from Florida Public
Utilities, that the installation of the natural gas supply lines will begin this
week. The timetable for completion
of the conversion is sometime in late August or Early September.
The Wireless Network Project is also underway, with the installation of some of
the required equipment being installed and tested. Epic Wireless Corporation, along with other cooperating third
parties are working to facilitate the installation of the nodes and other
infrastructure that will be needed to complete the project.
Management, along with the Committee responsible for this project will
keep the community up to date as the project progresses.
T.E.M. Systems has ordered all of the necessary equipment for the Security
Access System that will be installed and implemented this fall.
Some of the work on this project, like electrical and cabling will be
done prior to the actual installation of the system and the Board along with
management are in the planning stages for the distribution and other
considerations for the actual conversion to the new Proximity Card Access.
We expect the majority of the system to be ready to go by the end of
September.
Management is receiving bids on the installation of Flow Meters at 11 Pump and 1
Well Station in Banyan Springs, as a result of new requirements set forth by the
South Florida Water Management District for renewal of the Association’s water
permit. Water permits are issued
every 5 years and the District requirements have become more stringent than in
the past, such as the requirement for accurate water usage tabulation.
When we receive the proposals, management will present to the Board for
consideration.
Thompson & Thompson Fencing replaced a 52’ section of chain link fence
just beyond the corner of Military Trail and Cedar Point Blvd., which was
knocked down sometime on July 27th.
The repair cost $950 and was completed on Tuesday July 31st.
Respectfully submitted,
Rick Leach, L.C.A.M.
Property
Manager
|