MANAGEMENT UPDATE
THURSDAY, APRIL 29, 2010
= = = = = = = = = = = = = = = = = =
The Annual Tree Trimming Project was completed on Tuesday, April 27th.
Frames Tree Service, once again did an outstanding job and actually ended
up removing more dead or dying trees than were on the original list at an
additional cost of $1,650.00.
TruGreen Landcare, trimmed, thinned or cut down large limbs of 50 areca palms in
the Patio Villas that were overgrown or hanging over the units. The cost of the
job was $2,450.00.
Yates & Associates, completed a preliminary as-built drawing of the
Fitness
Center
Building
to better give the Board information on the possibilities to improve and
enlarge the
Fitness
Center
. The Board is awaiting a detailed
drawing that will help determine the actual scope and cost estimates for the
project, which could be done next year.
The contract for the flooring upgrade in the Clubhouse with Mario Ferazzoli
& Son, to remove the Mexican tile and install Porcelain tile was signed on
Monday, April 12th. The
POA paid the deposit to order the tile and finalized the starting date, as well
as other plans for the project. Although,
some preliminary work by our staff will be done prior to the start date, the
Clubhouse will be closed beginning on Friday, July 9th and will
remain closed for at least one week. This
will include the Café, Card Rooms, Activity Rooms and the Banyan Room, as the
air conditioning will be off during the removal process.
As soon as this phase is complete, some of the areas will be reopened
after the installation of the tile. The
entire project could take three weeks to complete, but the Pool and
Fitness
Center
Building
will remain open for use and the office will remain operational during the
project.
Management has received further information on the cost of modifications to the
Japanese Hot Tubs and the Spa at the Cabana Pool, which will comply with the new
mandate by the Florida Department of Health by July of 2011.
As previously mentioned to the Board, the installation of collector tanks
must be installed for both of these areas. Information
from various sources indicates a cost of $48,000.00 to $50,000.00 to complete
the needed upgrades and the Board will be looking at various options for funding
before making the decision to proceed. Pugh
Pools, Inc. has submitted proposals to do modifications to the Spa at the Cabana
and options for modifying the Japanese Hot Tubs, which will be discussed later
at this meeting.
Management and the Board are still gathering information on the cost to improve
and clean up the Cabana Club. Some
items like staining the pool deck can be done in-house at a very low cost, while
others will have to be done by professionals.
We are hopeful that at least some of the improvements can be completed
this summer.
The Recording of the Certificate of Amendment to the Declaration, Article 7.3,
has been completed. This is the
Amendment that was approved by two thirds of the membership, which allows
members of the Board to serve three year terms.
Robert Dow, Harry Sassower and Mel Teitzman, will all serve for three
years, as they received the highest number of votes in the 2010 Election.
In 2011, three of five candidates will serve for three years, with two
serving for one year, and then in 2012, all three elected members will serve for
three years.
A recent Florida Power & Light Energy Survey was conducted for the Clubhouse
and the Center of the POA. Management,
along with executive members of the Board made the decision to enroll in FPL’s
On Call Program, which will save us $1,680.00 per year on our electric bill.
FPL will be contacting us within the next few weeks to install the
equipment for this program.
Al Hoffer’s Pest Protection Services were here last week to spray for weeds
and to fertilize the lawns in the entire community.
The Landscaping Committee has informed Management that in a couple of weeks the
impatiens in the flower beds will be removed and shortly thereafter replaced
with flowers or plants to keep these areas looking great.
Lamn, Krielow Dytrych & Company, the firm that has been conducting the 2009
audit, should have the 2010 Financial Statement ready for distribution within
the next few weeks. At that time, we
will notify all unit owners, when it is available at the office.
Respectfully submitted,
Rick Leach, L.C.A.M.
Property Manager