MANAGEMENT UPDATE
THURSDAY,
FEBRUARY 11, 2010
=
= = = = = = = = = = = = = = = = =
Sunstate Cleaning Systems chemically cleaned the sidewalks at
Cedar Point Blvd.
,
Mangrove Drive
,
Cedar Lake Drive
and
Rosehill Drive
on January 21st and 22nd. The
cost of this project was $4,200.00 and was long overdue to be done.
On January, 28th, CJ’s Portable Welding repaired the track on the
resident’s gate at the main entrance, which had lifted up from the roadway and
was extremely noisy. The cost of the
repair was $1,597.50.
Thompson & Thompson Fencing repaired a breech on the bottom of the perimeter
fence at the corner of
Boynton Beach Blvd
and Military Trail. Cost of repair
totaled $275.00 and was completed on Friday, January 22nd.
Over the last month, a number of vehicles were entered, vandalized and one
vehicle was stolen overnight. In
most of these cases, the vehicles were left unlocked, which allowed persons to
rummage through the vehicles. Please
remember to always lock your vehicle and if you see any suspicious activity,
please call 911 immediately.
The staff repaired textured and painted areas of the interior walls of The
Center, which were damaged over the last couple of years.
In addition, our staff painted some of our signs at the main entrance of
the community, as well as other areas in the Clubhouse.
Management has received two proposals to install additional street lighting on
Hickorywood Place
,
Laurelwood Place
and
Shadywood Place
to better illuminate these dark areas. Over
the years, the Board has tried to incrementally add street lighting each year
and is looking to do the same this year, thus will discuss this matter later in
the meeting.
Management has ordered a new drinking fountain from Watermasters of Palm Beach,
Inc. to replace the fountain in the hallway of the Clubhouse. Unfortunately, we
were unable to get the old one repaired and since they no longer make a model
the size of the old fountain, our staff had to make some alterations in order to
place a new model in that location. The
cost of the fountain is $1,087.37, which includes installation.
We expect it to be installed early next week.
The General Meeting of the Banyan Springs Board of Directors is scheduled for
next Wednesday,
February 17, 2010
at
7:30pm
in the Center.
The office will be closed on
Monday, February 15, 2010
for Presidents Day. If you have
guests coming in for the holiday weekend and need an extra access fob for them
to use, please stop by the office tomorrow and you can rent one for a $50.00
deposit.
Respectfully submitted,
Rick Leach, L.C.A.M.
Property Manager