MANAGEMENT UPDATE
THURSDAY, FEBRUARY 3, 2011
= = = = = = = = = = = = = = = = = =
In early January, the POA finally received a check for an insurance claim for an
incident that occurred on June 28, 2010, which damaged an electrical box and the
fence across from Ashley Lakes Apartments. The check for $1,256 covers the
damages that were repaired over the summer.
We are currently waiting on another check from the insurance company of a
resident that did extensive damage to the fence and ficus hedges along
Cedar Point Blvd
behind Terrace Homes #I Condominium on December 31, 2010.
Damages totaled $4,060 and we fully anticipate receiving full
reimbursement for this incident.
Atlantic Refrigeration installed a new air handler for the Spa Area, where the
Japanese Hot Tubs, Sauna and Steam Room are located on Wednesday, January 12,
2011 at a cost of $3,763.
The contractor for the installation of the water line for Boynton Beach
Utilities, Felix & Associates, is finishing up work on the water pipe line
project for the City of
Boynton Beach
. After the construction is complete, the City of
Boynton Beach
will restore the area that the City paid $20,000 to Banyan Springs for the
Easement during the project.
Al Hoffer’s Pest Protection Services was in the community in Mid-January to
fertilize the lawns and shrubs throughout Banyan Springs, as part of the
Association’s Contract of services.
On Monday, January 17th, Rapid Rooter took a video of a drainage pipe
at
10156 Mangrove Drive
and discovered that a large section of the main drainage pipe was broken in a
couple of sections with roots impeding the flow of waste water.
Since the problem is located on common property, Rapid Rooter was
contracted to excavate, remove the roots and replace 3 sections of drainage
pipe. The entire cost of the project
totaled $6,790.55 and was completed on Tuesday, January 18th.
Fineline Electric Inc., was here last week to run new wiring for electrical
outlets in the Banyan Room to solve the problem of the coffee makers tripping
the breakers during events in that room. The
outlets that are normally used for this purpose are now isolated, which should
solve the problem and the cost of the improvement totaled $1,011.78
The Banyan Springs Social Club has made a $700 Donation to the POA for purchase
of ice buckets to be used by the various clubs for functions at the Center.
The Board thanks the Social Club for their generosity.
Executive members of the POA Board met with Don Brady of R.V. Johnson Insurance
Agency on Monday, January 31st, to go over the new insurance policies
for 2011 for the POA. We anticipate
the POA insurance policies to come in within the Budget for 2011.
On Tuesday February 8th Don Brady will be meeting with
Condominium Board Members to go over Property Insurance for the each Association
in the Banyan Room at 2:00 P.M.
Air Ref Electric, was here yesterday to install the lighting that was approved
by the Board at the December 30th Workshop Meeting for highlighting
the “Bird Tree” sculpture in the Center.
The entire project including wiring, fixtures and installation totaled
$4,900.00 and will be completed today.
Our staff is currently working on cosmetic improvements to the men’s restroom
in the Cabana Clubhouse. The staff
will be working on the women’s restroom next week and hope to have everything
completed by the end of next week.
A number of our residents have experienced problems entering the community at
either of the resident gates, which means that your bar code sticker needs to be
replaced with a new one. You can stop by the office during business hours and we
will remove the old sticker and put a new one on your vehicle.
This month’s POA General Meeting is scheduled for Wednesday, February 16, 2011
at 7:30 P.M., in the Center. All
residents are invited to attend.
Respectfully submitted,
Rick Leach, L.C.A.M.
Property Manager